Video and Sound: Final Project

Video and Sound
02/11/2018 - 30/11/2018 (Week 10 to Week 14)
Afsah Faheem (033242)
Video and sound Final Project

INSTRUCTIONS

Final Project

Week 10
This week was when we got sorted into groups and unfortunately my group got disbanded so I was added into a different group.

Cast list
Director: Megan
Assistant Director: Shanmay
Director of Photography: Irfan
Sound: Afsah
Video Editor: Allen

Week 11
This week, Megan shared her group story and plot with me and explained the storyline with me.

       
1.1 Plot line

Week 12
This week, we created a shot list so it would be easier for us to know which shot to film and how to film it so we could save time when the actual day of shooting came.







1.2 Shot list

1.3 Actors

Week 13
This was a week before filming so we had to get props ready which was my job since I was also art director. 




1.4 Props

Week 14
This week was shooting week so we headed to uni super early to set and start filming since it was going to be a long day.





1.5 Behind the scenes.

1.6 After a 12 hour shoot it was a wrap and here we all are, tired and hungry but it was worth the final outcome.

Allen was given the task of video and sound editing an the did a great job at it. 

1.7 Colour Correction



1.8 Colour Correction References

1.9 Final Video

Comments

Popular posts from this blog

Typography Final Compilation and Reflection

Illustration and Visual Narrative

Typography Final Project